Utilities

Bulk Water Filling Station Closure

The City of Durango bulk water filling station located at 550 S. Camino del Rio, will be closed for construction starting Monday, September 21, 2020 through December 2020.  

Please visit the Water Dock Page for alternative bulk water filling stations and more information.

City of Durango Ridges Basin Water Treatment Plant Siting Study

The City of Durango engaged SGM Engineering to conduct a siting study around Ridges Basin Dam to evaluate available sites for a potential location of a second treatment plant (RBWTP) to access and utilize Lake Nighthorse water supplies acquired by the City in 2012. The study is available here

City of Durango Drought Management Plan

Drought Plan Cover Picture Opens in new window

The City of Durango Drought Management Plan has been compiled and is available for review. 

Water and Wastewater Rate and Fee Study

City of Durango Rate and Fee Study 2019 Opens in new window

The City of Durango engaged in the development of a Water and Sewer Rate and Fee Study during 2019. 

City of Durango Vulnerability, Consequences and Adaptation Planning Report (VCAPS)

The City of Durango VCAPS Report is the result of a planning effort to raise awareness, understanding of impacts and identify options challenges the City will face in regard to drought and extreme precipitation which may be more likely in light of scientific uncertainty in ongoing climate and weather patterns.